Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FP LUX SCURF DYKE SOLAR LIMITED

7 unique locations (396 components)

Active MW: 76.55 MW
Inactive MW: 614.01 MW
SK14 (64 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
1.65 MW
RH16 (112 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.78 MW
PE20 (28 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
1.60 MW
LANGLEY AVENUE SHIREMOOR NEWCASTLE UPON TYNE NE27 (3 components)
• Domestic EV charger
• One 2MW gas CHP in a horticultural environment exporting excess load. Applying under Rule 3.6.1(a)(ii)(bb) - operational since June 2017 Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ SJ 771 745
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.60 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire (1 component)

Solar PV Park with maximum export capacity of 49.9MW

Active • 2025-26 (T-4)
IG1 (39 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
9.10 MW
BA2 (149 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
9.10 MW
Loading map...
Showing 7 locations