Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

787 unique locations (10054 components) - Page 29 of 32

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.56 MW
Denton Crownpoint Rp - Central Manchester M34 3LY (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.02 MW
Drakemyre, Dalry KA24 5JJ (44 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Drayton High Road, Hellesdon, NR6 5DT (5 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
Earls Road, Earlsgate Park Grangemouth, FK3 8UU (3 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Ellesmere Prt Cheshr Oak - Wirral and Chester CH65 9HD (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.04 MW
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (10 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2026-27 (T-4), 2023-24 (T-4) ...
3.22 MW
Foxbridge Way, Normanton, WF6 1TL (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Galleon Blvd, Dartford, DA2 6QA (2 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2022-23 (T-4), 2021-22 (T-4)
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 9SB (2 components)
• Four POSGUs (standby diesel generators) each having 1.4MW capacity.
• Four POSGUs (standby generators) each having 1.4MW capacity.
Active • 2022-23 (T-4), 2021-22 (T-4)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (6 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2025-26 (T-4), 2022-23 (T-1)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (2 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2028-29 (T-4), 2025-26 (T-1)
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (39 components)

load curtailment at site

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.07 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Hereford - Chelthenham and Worcester HR4 9AA (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.04 MW
High Street, Edinburgh, EH33 1LP (18 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
High Street, Waterham, nr Faversham, Kent ME13 9EJ (14 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (6 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Active • 2025-26 (T-4), 2022-23 (T-1)
Hunter Boulevard, Magna Park, LE17 4XN (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Joan Ln, Bamford, Hope Valley S33 0AW (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2023-24 (T-4) ...
3.56 MW
Joan Ln, Bamford, Hope Valley S33 0BE (1 component)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4)
3.60 MW
Loading map...
Showing 25 locations