Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

105 unique locations (853 components) - Page 1 of 5

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (8 components)
• Load curtailment via standby generation exporting excess
• Load reduction on-site and standby generation
Active • 2017-18 (T-1), 2020-21 (T-4) ...
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (8 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Active • 2018-19 (T-1), 2019-20 (T-1) ...
17 Oaktree Road Fen Drayton Cambridge CB24 5SS (6 components)

Two gas CHP engines 1.42MW and 1.42MW. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
3 Nutmeg Ln, London E14 2AX (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 4AA (7 components)

Gas CHP engines - two 1.47MW and one 1.51MW. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
5 Barrow Man Road, Birchington Kent CT7 0AX (8 components)

One 3.34MW CHP engine in a horticultural environment with no auxiliary load.

Active • 2017-18 (T-1), 2020-21 (T-4)
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (4 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Active • 2021-22 (T-4), 2022-23 (T-4)
Aldergrove Nursery, Marsh Road, Southport PR9 8DX (7 components)

Two engines, one of 2.679MW and one of 2.004MW to be supporting a horticultural environment. Primary fuel type = natural gas

Active • 2017-18 (T-1), 2020-21 (T-4)
ASDA Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2017-18 (T-1), 2019-20 (T-1) ...
4.28 MW
ASDA Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2017-18 (T-1), 2019-20 (T-1) ...
4.28 MW
Bailey Drive Gillingham Business Park Gillingham ME8 0WG (4 components)

Load reduction

Active • 2021-22 (T-4), 2022-23 (T-4)
Bankside 2 & 3, 90-100 Southwark Street, London, SE1 0SW (9 components)
• Standby generation DRUPS taking site load, non-exporting
• Standby generation DRUPs taking site load. No export
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Barrow Man Road Birchington Kent CT7 0AX (8 components)

Two 3.3 MW CHP gas engines. Primary fuel type = Natural Gas

Active • 2017-18 (T-1), 2020-21 (T-4)
Bewl Bridge Treatment Works, Bewl Bridge Lane, Lamberhurst, Tunbridge Wells, TN3 8JH (8 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4) ...
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (12 components)

2 x 0.8MW POSGU (standby generation).

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Bower Building, University of Glasgow, University Avenue, G12 8QQ (5 components)

CHP generator exporting to private wire network at the University of Glasgow.

Active • 2019-20 (T-1), 2022-23 (T-4)
Bowland View Preston PR2 5QT (4 components)

Combination of load curtailment and standby generation

Active • 2021-22 (T-4), 2022-23 (T-4)
Bowland View Preston PR3 1LR (7 components)

Combination of load curtailment and standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (5 components)

CHP exporting to a private wire network in a manufacturing environment.

Active • 2019-20 (T-1), 2022-23 (T-4)
Broom Road, Stone ST15 0TE (8 components)
• Load curtailment
• Load reduction
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Buckland Gardens, Broadway, Worcestershire WR12 7LY (12 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Active • 2017-18 (T-1), 2018-19 (T-1) ...
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (6 components)

Standby generation

Active • 2017-18 (T-1), 2020-21 (T-4)
Bush Estate Penicuik EH26 0QA (6 components)

Mixture of load reduction and standby generation.

Active • 2017-18 (T-1), 2020-21 (T-4)
Cairnton Road, Boyndie, Banffshire, AB45 2LR (10 components)
• Standby diesel generator that reduces site load when generating.
• Standby generation
• Standby generation from a POSGU.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
Carr Industrial Estate, Doncaster, South Yorkshire, DN4 5JJ (12 components)

Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Loading map...
Showing 25 locations