{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

12 unique locations (503 components)

Active MW: 44.30 MW
Inactive MW: 21.20 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (4 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (4 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (7 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
DSR FLEXITRICITY LIMITED Conival FLEX162 +1 more RG40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)

6 CHP engines horticultural environment with no auxiliiary load (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (6 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (2)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
N/A (442 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (5 components)
• Water source heat pumps at 1748kW each (2)
• Water Source Heat Pumps at 1748KW each (x2)
DSR FLEXITRICITY LIMITED FLEX162 FLEX162 GU7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 12 locations