Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

13 unique locations (151 components)

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
Wytch Farm, Wareham BH20 5JR (9 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Active • 2018-19 (T-1), 2019-20 (T-1) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (13 components)

3 x 1.6MW POSGU (standby generation)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (11 components)

2 POSGU (1.0MW and 0.6MW)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (13 components)

2 x POSGU (each 1MW)

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Minerva Road, Farnworth, Bolton, BL4 0JR (10 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• CHP generating in NHS hospital. No aux load.
Active • 2018-19 (T-1), 2019-20 (T-1) ...
London Road, Redhill, Surrey RH1 1LJ (5 components)

2 x POSGU , each 0.8MW

Active • 2018-19 (T-1), 2021-22 (T-4)
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (10 components)
• CHP generating in NHS hospital. No aux load.
• CHP generating to cover site load, which exceeds generating capacity. No aux load.
Active • 2018-19 (T-1), 2019-20 (T-1) ...
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (31 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Active • 2017-18 (T-1), 2018-19 (T-1) ...
Deepdale Stadium, Sir Tom Finney Way, Preston PR1 6RU (5 components)

Gas CHP in a leisure & business environment providing heat and electricity to function suite and stadium and exporting excess

Active • 2018-19 (T-1), 2021-22 (T-4)
Carr Industrial Estate, Doncaster, South Yorkshire, DN4 5JJ (12 components)

Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services

Active • 2017-18 (T-1), 2018-19 (T-1) ...
Buckland Gardens, Broadway, Worcestershire WR12 7LY (12 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Active • 2017-18 (T-1), 2018-19 (T-1) ...
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (12 components)

2 x 0.8MW POSGU (standby generation).

Active • 2017-18 (T-1), 2018-19 (T-1) ...
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (8 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Active • 2018-19 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 13 locations