FLEXITRICITY LIMITED
45 unique locations (104 components) - Page 1 of 2
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (2 components)
2 x POSGU , each 0.8MW (2)
Stretfield, Derbyshire, S33 9JT (2 components)
Load reduction on site supported by non-exporting standby generation. (2)
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (2 components)
Standby generation (2)
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (2 components)
One CHP of 1.0MW. Primary fuel type = Natural Gas (2)
Paddington Green Campus, London, W2 1NB (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Melrow Nursery, Rydings Lane, Southport, Merseyside PR9 8EB (2 components)
One 2.679MW gas CHP engine in a new energy centre supporting a horticultiral environment. Primary fuel type = natural gas (2)
Meerbrook, Leek, Staffordshire, ST13 8TQ (2 components)
Load reduction on site supported by non-exporting standby generation. (2)
Manchester Mail Centre, 77 Oldham Road, Manchester, Lancashire M4 5AA (2 components)
Standby generation (2)
Main Street, Burstwick, Hull, HU12 9EA (2 components)
Two engines of 2.7MW each and one of 1.9MW, all CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas (2)
Main Street, Brough, East Yorkshire HU15 2PR (2 components)
Two assets 1.4MW and 1.9MW, both CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas (2)
Knypersley Generator Unit G Forge Way Brownlees Industrial Estate Knypersley Stoke on Trent ST8 7DN (2 components)
Four reciprocating engines 1.7MW and one of 1.6MW capacity. Primary fuel - gasoil (2)
Joan Ln, Bamford, Hope Valley S33 6RB (2 components)
Load reduction on site supported by non-exporting standby generation. (2)
Ide Hill Road, Bough Beech, Edenbridge TN8 7PJ (2 components)
Standby generation (2)
Holditch Power Station Holditch Road Lymedale Business Park Newcastle under Lyme ST5 9JA (2 components)
Three reciprocating engines each with 2.66MW capacity. Primary fuel type = Natural Gas (2)
High Street Waterham Kent ME13 9EJ (2 components)
6 CHP engines of 1.5MW each. Primary fuel type = Natural Gas (2)
High Dike, Grantham NG32 3QD (3 components)
Load reduction on flexible electricity consuming processes (3)
Harbour House, Marine Parade Dover Kent CT17 9BU (3 components)
Hanson Place, Gorrells Way, Rochdale, OL11 2NQ (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (3 components)
Load reduction on site supported by non-exporting standby generation. (3)
Gogar Station Road, Gogarburn Edinburgh EH12 1HQ (2 components)
Four POSGUs (standby diesel generators) each having 1.4MW capacity. (2)