Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

17 unique locations (156 components) - Page 1 of 2

Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (7 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.45 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (34 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.82 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (7 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.96 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (13 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
8.73 MW
Ottringham Road Keyingham Hull North Humberside HU12 9RX (8 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Montgomery Road, Aberdeen AB24 2YA (17 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.86 MW
Minerva Road, Farnworth, Bolton, BL4 0JR (5 components)
• CHP generating for site load, which exceeds generating capacity. No aux load.
• CHP generating in NHS hospital. No aux load.
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.27 MW
George Square Charles St Lane EH8 9AG (3 components)

CHP generating for site load, which exceeds generating capacity. No aux load.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 10 locations