Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

111 unique locations (301 components) - Page 1 of 5

Active MW: 0.00 MW
Inactive MW: 0.00 MW
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (4 components)
• Load curtailment via standby generation exporting excess (2)
• Load reduction on-site and standby generation
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more G32
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components)
• 3 x 1.2MW gas CHP in a hospital environment. (2)
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX50 FLEX50 Rejected G51
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
17 Oaktree Road Fen Drayton Cambridge CB24 5SS (2 components)

Two gas CHP engines 1.42MW and 1.42MW. Primary fuel type = Natural Gas (2)

FLEXITRICITY LIMITED Existing Generating CMU FLEX13 CB24
Inactive • 2020-21 (T-4), 2017-18 (T-1)
3 Nutmeg Ln, London E14 2AX (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Conival FLEX76 +1 more E14
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
46 Station Road Stokesley Middlesbrough TS9 4AA (2 components)

Gas CHP engines - two 1.47MW and one 1.51MW. Primary fuel type = Natural Gas (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX09 TS9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
5 Barrow Man Road, Birchington Kent CT7 0AX (2 components)

One 3.34MW CHP engine in a horticultural environment with no auxiliary load. (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX19 CT7
Inactive • 2020-21 (T-4), 2017-18 (T-1)
77 Oldham Road, Manchester, Lancashire M4 5AA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

DSR FLEXITRICITY LIMITED Unproven DSR CMU FLEX70 M4
Inactive • 2021-22 (T-4)
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components)

Gas generation peaking plant comprising of 9 x 2MW engines (2)

Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX51 FLEX51 Conditional YO19
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Aldergrove Nursery, Marsh Road, Southport PR9 8DX (2 components)

Two engines, one of 2.679MW and one of 2.004MW to be supporting a horticultural environment. Primary fuel type = natural gas (2)

FLEXITRICITY LIMITED New Build Generating CMU FLEX28 PR9
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bailey Drive Gillingham Business Park Gillingham ME8 0PZ (1 component)

Load reduction

FLEXITRICITY LIMITED Unproven DSR CMU FLEX71 ME8
Inactive • 2017-18 (T-1)
Bailey Drive Gillingham Business Park Gillingham ME8 0WG (2 components)

Load reduction (2)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX71 ME8
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Bankside 2 & 3, 90-100 Southwark Street, London, SE1 0SW (3 components)
• Standby generation DRUPs taking site load. No export (2)
• Standby generation DRUPS taking site load, non-exporting
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX72 Tinto SE1
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Barrow Man Road Birchington Kent CT7 0AX (2 components)

Two 3.3 MW CHP gas engines. Primary fuel type = Natural Gas (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX04 CT7
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Benfield Way Lakes Road Braintree CM7 3YS (1 component)

Load reduction

FLEXITRICITY LIMITED Unproven DSR CMU FLEX71 CM7
Inactive • 2017-18 (T-1)
Bewl Bridge Treatment Works, Bewl Bridge Lane, Lamberhurst, Tunbridge Wells, TN3 8JH (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 TN3
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (4 components)

2 x 0.8MW POSGU (standby generation). (3)

DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX62 FLEX62 MK1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Bower Building, University of Glasgow, University Avenue, G12 8QQ (2 components)

CHP generator exporting to private wire network at the University of Glasgow. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected G12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
BOWLAND VIEW, FULWOOD, PRESTON, LANCASHIRE, PR2 5QT (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

DSR FLEXITRICITY LIMITED Unproven DSR CMU FLEX83 PR2
Inactive • 2021-22 (T-4)
Bowland View Preston PR2 5QT (2 components)

Combination of load curtailment and standby generation (2)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX71 PR2
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Bowland View Preston PR3 1LR (1 component)

Combination of load curtailment and standby generation

FLEXITRICITY LIMITED Unproven DSR CMU FLEX71 PR3
Inactive • 2017-18 (T-1)
Bowland View Preston PR3 1LR (1 component)

Combination of load curtailment and standby generation

FLEXITRICITY LIMITED Unproven DSR CMU FLEX71 PR3
Inactive • 2020-21 (T-4)
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (2 components)

CHP exporting to a private wire network in a manufacturing environment. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected SK7
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Broom Road, Stone ST15 0TE (4 components)
• Load curtailment (2)
• Load reduction
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more ST15
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Buckland Gardens, Broadway, Worcestershire WR12 7LY (4 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (2)
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Building 8, Chiswick Park, 566 Chiswick High Road, London W4 5XU (2 components)

Standby generation (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations