Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• Load reduction
• N/A
Active • 2025-26 (T-4), 2022-23 (T-3) ...
ASDA Didcot Ambient Distribution Centre, Sutton Courtenay Rd, Abingdon, OX14 4SE (11 components)
• 4 x reciprocating engines
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
5.39 MW
Asda Garston, St Marys Road Garston, Liverpool, L19 1SJ (12 components)
• Load curtailment
• Load curtailment from refridgeration
• N/A
Active • 2028-29 (T-4), 2024-25 (T-1) ...
4.80 MW
ASDA Washington ADC, Pattinson Ind Est District 15, NE38 8QA (12 components)
• Existing OCGT
• Load curtailment from refridgeration
• Load reduction from refrigeration
Active • 2028-29 (T-4), 2024-25 (T-4) ...
5.39 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Barnsley Facilities Services Limited Estates & Facilities Department Gawber Road Barnsley S75 2EP (14 components)
• 1 MW CHP generation
• 30MW/30MWh one hour battery storage asset located near BURWB1 asset
• Siemens SGT200 based CHP
Active • 2026-27 (T-4), 2024-25 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Broom Road, Stone ST15 0TE (3 components)
• Load reduction
• New reciprocating genset in acoustic enclosure
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT4 9RW (8 components)
• 1 x OCGT
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Crown Point Glasshouse, Kirby Road, Norwich, NR14 7DU (2 components)
• 3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
• Gas fired reciprocating engines.
Active • 2024-25 (T-4), 2021-22 (T-4)
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (13 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Halfway Industrial Estate, Halfway, Sheffield, S20 3GZ (16 components)
• Load reduction
• New build power station comprised of multiple reciprocating engines.
• The CMU comprises Lithium Ion batteries housed in ISO containers with an additional containers used to house the converters.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (12 components)
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
• Gas reciprocating engines
• Ratcliffe Unit 4 coal-fired unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
• A Battery Energy Storage System.
• Combined Heat and Power Plant Olympic Park London
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (15 components)
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2021-22 (T-4) ...
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
• Battery energy storage unit
• CHP at a horticultural environment.
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land to west of Grange Lane Brinsworth Rotherham S60 1FG (2 components)
• Load reduction on site supported by non-exporting standby generation.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
• Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.
• New reciprocating gensets in acoustic enclosure
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Ratcliffe Unit 3 coal-fired unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
• Load reduction on site supported by non-exporting standby generation.
• The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
• West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Loading map...
Showing 25 locations