Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

56 unique locations (506 components) - Page 1 of 6

1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components)
• 3 x 1.2MW gas CHP in a hospital environment. (2)
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (3 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
5.46 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.13 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.25 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2 components)

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2)

Active • 2025-26 (T-4), 2022-23 (T-1)
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.52 MW
Ashgrove Road West, Aberdeen AB16 5UL (18 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Barrow Man Road Birchington Kent CT7 0AX (10 components)

Two CHP engines in horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Beach Esplanade, Aberdeen AB24 5NR (11 components)

District heating implementation with one asset 1MW and no auxiliary load (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Loading map...
Showing 10 locations