Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

1614 unique locations (13195 components) - Page 1 of 65

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
Active • 2028-29 (T-4), 2027-28 (T-4) ...
100 Princes Road Hulme, Manchester, M15 5AS (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
100 The Jewel, Brunstane, Edinburgh, EH15 3AR (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
105 Kelynmead Road Sheldon, Birmingham, B338LF (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
107/111 High Street Wath Upon Dearne, Rotherham, S63 7PX (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
108/110 High Street Strood, Kent, ME2 4TR (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
10 Queens Drive , Kilmarnock, KA1 3XF (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
110-114 High Street , Hoddesdon, EN118HD (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
118 Forest Road New Ollerton, Newark, NG229PL (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (3 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on-site and standby generation
Inactive • 2022-23 (T-1), 2020-21 (T-4) ...
126 Smithdown Road , Liverpool, L15 3JR (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
130 Chase Side , London, N14 5PW (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
13/15 Crook Log Bexley HeathLondon, London, DA6 8EQ (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (7 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
• A gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
142 London Road , London, KT2 6QL (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
144 Houghton Road Thurnscoe, Barnsley, S630JZ (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
147 New Line , Bradford, BD10 0BT (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
158 Clapton Common Stamford Hill, London, E5 9AG (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
161 High Street Ramsgate, Kent, CT11 9TT (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
163 Beverley Road , Hull, HU3 1TY (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
171 Towngate , Leyland, PR252TE (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (11 components)
• EV charging at residential premises
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
4.80 MW
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (2 components)

2 x gas fired CHP generators located at a horticultural site.

Active • 2028-29 (T-4), 2024-25 (T-4)
17 Oaktree Road Fen Drayton Cambridge CB24 5SS (5 components)

Two gas CHP engines 1.42MW and 1.42MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations