Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

1627 unique locations (13277 components) - Page 58 of 66

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Princess Way, Burnley, BB12 0EQ (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Private Road No.5, Colwick, Nottingham, NG4 2JU *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (4 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• New reciprocating genset in acoustic enclosure
Inactive • 2020-21 (T-4), 2018-19 (T-1)
Pudding Lane Spalding, Lincs, PE11 3TJ (2 components)
• Load curtailment and standby generation
• Warrington Existing Site CHP
Inactive • 2023-24 (T-1), 2017-18 (T-1)
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (4 components)
• Load reduction
• This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the 11kV network in WPD's West Midland region.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Queens Road, Ashton Under Lyne, OL6 8ER (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
QUIDHAMPTON, POLEHAMPTON FARM, ASHE LANE, OVERTON, BASINGSTOKE, RG25 3BS (1 component)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-3)
Radford Rd Hyson Green, Nottingham, NG7 5FP (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Reddish Lane , Manchester, M18 7JH (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Redditch Generation Station Windsor Road Redditch B97 6HE (6 components)
• Gas turbine generator
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Redhouse Interchange, Adwick-Le-Street, DN6 7FB (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Regent House Green Lane, Stoneycroft, L13 6RH (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Reigate Road , Burgh Heath, KT20 5NZ (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (5 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• One CHP of 1.0MW. Primary fuel type = Natural Gas
Inactive • 2022-23 (T-4), 2017-18 (T-1)
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)
• A gas fuelled generating station.
• The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT
• load curtailment at site
Active • 2025-26 (T-1), 2023-24 (T-1) ...
Rhymney 1 STOR Gen Room Unit 48 Portmanmoror Road Industrial Estate Rover Way Cardiff CF24 5HB (2 components)
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
• Gas reciprocating engines
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Rivergate Centre , Irvine, KA12 8EH (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Riverside House, Main Street, Rotherham S60 1AE (4 components)

Load reduction and generation via standby assets

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Riverside Retail Park, Aberdare, CF44 0AH (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
River View Drive , Aberdeen, AB21 7NG (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Rosper Road Immingham North Lincolnshire DN40 3DZ (1 component)

Standby generation, submetered, taking site load

Inactive • 2020-21 (T-4)
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (47 components)
• A gas engine CHP site providing hot water to a local district heating network
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Roundswell Business Park, Barnstable, Devon EX31 3TD (3 components)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)
• Aggregate CMU from Multiple Sources
• Front of the Meter battery storage asset located in Devon.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations