Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

677 unique locations (6276 components) - Page 3 of 68

Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 9SB (2 components)
• Four POSGUs (standby diesel generators) each having 1.4MW capacity.
• Four POSGUs (standby generators) each having 1.4MW capacity.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
George at Asda, Atherleigh Way WN7 5RZ (8 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
• Load drop
• Load drop by on-site generation
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (6 components)

Combination of load curtailment and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Dock Yard Rd, Ellesmere Port, CH65 4EG (8 components)
• BtM storage as standby generation, non-exporting
• BtM storage providing standby capacity
• BtM storage/standby generation; non exporting
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 10 locations