Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

41 unique locations (418 components) - Page 3 of 5

Active MW: 995.01 MW
Inactive MW: 2137.37 MW
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (4 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Active • 2028-29 (T-4), 2025-26 (T-1)
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (17 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
LADYSMITH ROAD, GRIMSBY, DN32 9EE (3 components)

CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE

Active • 2025-26 (T-4), 2022-23 (T-1)
HUMBERSTONE ROAD, GRIMSBY, DN32 8HW (3 components)

CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW

Active • 2025-26 (T-4), 2022-23 (T-1)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (11 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (3 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE (3 components)

CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE

Active • 2025-26 (T-4), 2022-23 (T-1)
Galley Hill Road Waltham Abbey Essex EN9 2AG (16 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.

Active • 2028-29 (T-4), 2025-26 (T-1)
Drakemyre, Dalry KA24 5JJ (25 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 10 locations