Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

782 unique locations (6960 components) - Page 2 of 79

Unit 1 Carter Square, Uttoxeter, ST14 8EU (1 component)

Load curtailment from refridgeration

Active • 2028-29 (T-4)
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (7 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (12 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
Active • 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (15 components)

Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
6.37 MW
Thearn Lane Woodmansey Beverley HU17 0SA (4 components)

Two gas CHP engines 1.52MW and 1.51MW. Primary fuel type = Natural Gas

Inactive • 2020-21 (T-4), 2017-18 (T-1)
2.33 MW
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.05 MW
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 10 locations