Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

35 unique locations (450 components) - Page 3 of 4

Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.27 MW
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bowland View, Fulwood, Preston, Lancashire PR2 5QT (8 components)

Standby generation

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (11 components)

District heating implementation with one asset 1MW and no auxiliary load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Ashgrove Road West, Aberdeen AB16 5UL (18 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.92 MW
Asda Straiton, Bush Estate, Penicuik EH26 0QA (8 components)
• Load reduction on site supported by standby generation
• Standby generation reducing load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations