Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

200 unique locations (15842 components) - Page 1 of 8

Active MW: 262.73 MW
Inactive MW: 2869.65 MW
CA2 (29 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CB7 (58 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.75 MW
CF14 (209 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF23 (101 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF3 (87 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CF36 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CF72 (80 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
0.60 MW
CH62 (54 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.75 MW
CH7 (108 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
13.15 MW
CM77 (58 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.55 MW
CM8 (70 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.28 MW
CM9 (62 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.82 MW
CO11 (23 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.75 MW
CO3 (72 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
CO6 (79 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CR2 (112 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.43 MW
CR5 (97 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.43 MW
CT21 (33 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.28 MW
CT7 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
8.43 MW
CV2 (48 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
CV21 (72 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.80 MW
CV32 (101 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
DA12 (57 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.40 MW
DA2 (53 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.55 MW
DD5 (82 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
4.75 MW
Loading map...
Showing 25 locations