Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

12 unique locations (503 components)

Active MW: 44.30 MW
Inactive MW: 21.20 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (5 components)
• Water source heat pumps at 1748kW each (2)
• Water Source Heat Pumps at 1748KW each (x2)
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX162 FLEX162 GU7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (6 components)

Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
N/A (442 components) Geocoding Needed
• DSR components shall be assigned prior to the start of the Delivery Year.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more Unproven DSR CMU CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Magna House, Stafford Park 3, Telford, Shropshire, TF3 3BH (6 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX169 TF3
Active • 2028-29 (T-4), 2025-26 (T-1) ...
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)

6 CHP engines horticultural environment with no auxiliiary load (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX01 FLEX01 +3 more ME13
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (7 components)
• Water source heat pump at 1883kW each (2)
• Water source Heat Pumps at 1883KW each
DSR FLEXITRICITY LIMITED Proven DSR CMU Conival FLEX162 +1 more RG40
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (4 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export. (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX166 E16
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX168 HU16
Active • 2028-29 (T-4), 2025-26 (T-1)
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX153 HA9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (4 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 12 locations