Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

12 unique locations (314 components)

Active MW: 686.88 MW
Inactive MW: 2445.49 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Heol Ty Newydd Cross Hands Food Park, Cross Hands, Llanelli, SA14 6RF, United Kingdom (22 components)
• Load Response - Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (34 components)
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck where it will be deposited in a storage bunker, from which it will be fed into two thermal units. Each unit will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Asda Sefton Park, 126 Smithdown Road , Liverpool, L15 3JR (11 components)
• Genset 3
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Norwich, Drayton High Road, Hellesdon, NR6 5DT (12 components)
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Load curtailment from refridgeration
• Load reduction from refrigeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.39 MW
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8TQ (5 components)
• Gas turbine generator
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Load reduction on site supported by non-exporting standby generation.
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Asda Dyce, River View Drive , Aberdeen, AB21 7NG (11 components)
• 1 x hydro turbine & synchronous generator
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Dundee Milton, Milton Of Craigie Longtown Road, Dundee, DD4 7RX (11 components)
• Generating unit 3.
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.60 MW
Asda Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Genset 1.
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Biggleswade, Church Street , Biggleswade, SG18 0JS (11 components)
• 1 x hydro turbine & synchronous generator
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Basildon Eastgate, Eastgate Shopping Centre , Basildon, SS14 1AE (11 components)
• Genset 2
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 12 locations