FLEXITRICITY LIMITED

16 unique locations (221 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Roundswell Business Park, Barnstable, Devon EX31 3TD (3 components)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (7 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A Prospective New Build Gas reciprocating energy reserve facility
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2025-26 (T-1), 2023-24 (T-1) ...
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (35 components)
• 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Land at West Road, Trafford Park, M41 7SW (8 components)
• A Battery Energy Storage System
• Battery Storage Station
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2025-26 (T-1), 2023-24 (T-1) ...
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Asda Worksop Gateford, 2 Celtic Point Raymoth Lane, Worksop, S81 7AZ (11 components)
• A 25MW New Build Battery Storage site
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Perry Barr, Walsall Road Perry Barr, Birmingham, B42 1AB (11 components)
• Battery Energy Storage System
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.75 MW
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• battery energy storage system
Active • 2028-29 (T-4), 2024-25 (T-1) ...
5.39 MW
Asda Hindley, Ladies Lane Hindley, Wigan, WN22QA (11 components)
• Load curtailment
• Load curtailment from refridgeration
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.02 MW
Asda Gravesend, Thames Way , Gravesend, DA11 0DQ (11 components)
• Battery Energy Storage System
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.75 MW
Asda Chepstow ADC, Newhouse Farm Ind Est, Chepstow, NP16 6UD (13 components)
• A Battery Energy Storage System.
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.39 MW
Asda Ashton Queens Road, Queens Road, Ashton Under Lyne, OL6 8ER (11 components)
• Load curtailment
• Load curtailment from refridgeration
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.80 MW
Asda Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (11 components)
• BATTERY ENERGY STORAGE SYSTEM
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
4.75 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 16 locations