FLEXITRICITY LIMITED

18 unique locations (271 components)

Active MW: 686.88 MW
Inactive MW: 2445.49 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• N/A
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
• 1.200MW BESS
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• District heating implementation of two gas CHP engines with no auxilliary load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Asda Chepstow ADC, Newhouse Farm Ind Est, Chepstow, NP16 6UD (13 components)
• A Battery Energy Storage System.
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.39 MW
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)
• Load reduction on site supported by non-exporting standby generation.
• One of three CHP in a horticultural environment
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
ASDA Import Center, Dabholm Rd, Middlesbrough, TS6 7RU (12 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• battery energy storage system
Active • 2028-29 (T-4), 2024-25 (T-1) ...
5.39 MW
Asda Rugby, entre Bailey Road,Central Park, Rugby CV23 0PD (5 components)
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• Load curtailment & standby generation
• New reciprocating gensets in acoustic enclosure
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XF (14 components)
• 49.99MW Lithium-ion Energy Storage System
• Battery energy storage unit
• Peak power plant
Active • 2027-28 (T-4), 2024-25 (T-1) ...
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (7 components)
• Lithium Ion battery storage system capable of importing, storing and exporting electricity.
• Manufacturing site providing demand response
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Manchester Rd, Carrington, Manchester M31 4TG (33 components)
• 2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (7 components)
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• Existing OCGT plant.
• Hospital
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Plot 6 Barrow Man Road, Birchington CT7 0AX (19 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• 49.900MW storage installation
• The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity is nominal and allows for site-specific variations.
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Units 1-4, 730 London Road, West Thurrock, Essex, RM20 3NL (8 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• DSR components to be assigned prior to the start of the Delivery Year.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Didcot B5 - CCGT MSID: 4055
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2026-27 (T-4), 2025-26 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2027-28 (T-4), 2024-25 (T-4) ...
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (11 components)
• Load reduction on site supported by non-exporting standby generation.
• N/A
• The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 MW.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 18 locations