FLEXITRICITY LIMITED

16 unique locations (91 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (6 components)
• Load reduction (2)
• Load shedding
DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 +3 more WF9
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Bailey Drive Gillingham Business Park Gillingham ME8 0PZ (5 components)

Load reduction (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX97 +3 more ME8
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Benfield Way Lakes Road Braintree CM7 3YS (7 components)
• Load reduction. (2)
• Load reduction
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX71 +5 more CM7
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Cairnton Road, Boyndie, Banffshire, AB45 2LR (6 components)
• Standby diesel generator that reduces site load when generating. (2)
• Standby generation
DSR FLEXITRICITY LIMITED Unproven DSR CMU FLEX72 FLEX75 +2 more AB45
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (2)
• Load curtailment
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX72 Tinto TS13
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Dock Yard Rd, Ellesmere Port, CH65 4EG (6 components)
• BtM storage providing standby capacity (2)
• BtM storage as standby generation, non-exporting
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX72 FLEX72 +2 more CH65
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load. (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 EH25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Elphinstone Research Centre, Tranent EH33 2NE (3 components)

Load drop by on-site generation (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX88 FLEX88 EH33
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Glebe Farm, Grunters Grange, East Keal, Spilsby Lincs PE23 4AY (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements (2)

Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Not Prequalified PE23
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (8 components)

One CHP, generating for site load which exceeds generating capacity. No aux load. (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 FLEX32 +1 more EH9
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements (2)

Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Not Prequalified HG3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Marsh Road, Banks, Southport PR9 8DX (14 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX33 FLEX33 +1 more PR9
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (6 components)

Eight gas CHP engines for commercial horticultural use with no auxilliary load (3)

CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU 888806 FLEX06 +1 more HU12
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Pedmore Road Brierley Hill West Midlands DY5 1LJ (7 components)

Load reduction (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX71 +5 more DY5
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements. (2)
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Not Prequalified PR7
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wrexham Industrial Estate Wrexham LL13 9UG (7 components)

Load reduction (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX71 +5 more LL13
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 16 locations