FLEXITRICITY LIMITED

17 unique locations (145 components)

Active MW: 991.08 MW
Inactive MW: 2141.30 MW
Wytch Farm, Wareham BH20 5JR (6 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (5 components)
• Gas generation peaking plant comprising of 9 x 2MW engines
• Two hour duration battery storage
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (8 components)
• Existing CMU comprising of battery storage and associated plant
• Gas reciprocating engines.
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas engines in a peaking plant environment
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (16 components)
• Energy facility comprising of reciprocating engine sets.
• Existing Energy from Waste Plant
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Saddlebow Road, Saddlebow, King's Lynn, Norfolk, PE34 3AG (1 component)

The construction of an peaking plant energy centre, which will house 15 gas engines and may be enhanced in future by battery storage.

Inactive • 2021-22 (T-4)
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (9 components)
• Existing OCGT.
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (14 components)
• Battery strorage unit
• Gas Peaking Reciprocating Engine
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Kellingley Colliery Turvers Lane, Knottingley, West Yorkshire, WF11 8DT. (7 components)
• 5 x Jenbacher 420 (1.4MW)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (4 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• The CMU is a new reciprocating engine based gas fuelled generating unit.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Crimplesham Main Road, Crimplesham, King's Lynn, Norfolk, PE33 9EA (1 component)

9 x 4.767MVA (3.81MW) gas engines in a peaking plant environment

Inactive • 2021-22 (T-4)
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (8 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (7 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• One of three CHP in a horticultural environment
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (7 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Load curtailment at site via standby generation
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (3 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Inactive • 2022-23 (T-4), 2021-22 (T-4)
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (17 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 17 locations