Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

4 unique locations (12 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Deepdale Stadium, Sir Tom Finney Way, Preston PR1 6RU (2 components)

Gas CHP in a leisure & business environment providing heat and electricity to function suite and stadium and exporting excess (2)

CHP and autogeneration FLEXITRICITY LIMITED New Build Generating CMU FLEX35 Rejected PR1
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Carr Lane, Leyland , Lancashire, PR25 3UD (2 components)
• 10 gas engines in an energy centre environment, exporting electricity
• 3 gas engines in an energy centre environment, exporting electricity
CHP and autogeneration FLEXITRICITY LIMITED New Build Generating CMU FLEX55 FLEX56 Rejected PR25
Inactive • 2021-22 (T-4)
Buckland Gardens, Broadway, Worcestershire WR12 7LY (4 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations. (2)
• One asset 1.935MW CHP engine in a horticultural environment with no auxiliary load. Primary fuel type = Natural Gas
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components)
• 3 x 1.2MW gas CHP in a hospital environment. (2)
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX50 FLEX50 Rejected G51
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 4 locations