Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

FLEXITRICITY LIMITED

9 unique locations (142 components)

Active MW: 686.88 MW
Inactive MW: 2445.49 MW
195 Aylesone Rd, Leicester LE2 7QJ (29 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BWW004, Egford Main, Egford Hill, Frome, BA11 3JJ (15 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
BWW010, Axbridge, Cheddar Road, Cheddar, Axbridge, BS26 2DL (17 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Clarke Avenue Porte Marsh Industrial Estate Calne SN11 9BS (10 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (13 components)
• A gas CHP generator providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (14 components)

load curtailment at site

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Melrow Nursery, Rydings Lane, Southport PR9 8EB (15 components)

The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …

Active • 2024-25 (T-4), 2021-22 (T-4) ...
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (15 components)
• Gas reciprocating engine
• N/A
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 9 locations