FLEXITRICITY LIMITED

9 unique locations (30 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components)
• 3 x 1.2MW gas CHP in a hospital environment. (2)
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX50 FLEX50 Rejected G51
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Bower Building, University of Glasgow, University Avenue, G12 8QQ (2 components)

CHP generator exporting to private wire network at the University of Glasgow. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected G12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Bramhall Moor Ln, Pepper Rd, Hazel Grove, Stockport SK7 5BJ (2 components)

CHP exporting to a private wire network in a manufacturing environment. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected SK7
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Chareteris Place Edinburgh EH8 8FN (2 components)

CHP generating for site load, which exceeds generating capacity. No aux load. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (8 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Frimley Park Hospital, Portsmouth Road, GU16 7UJ (3 components)
• CHP generating to cover site load, which exceeds generating capacity. No aux load. (2)
• CHP generating in NHS hospital. No aux load.
Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU F18102 Rejected GU16
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
George Square Charles St Lane EH8 9AG (2 components)

CHP generating for site load, which exceeds generating capacity. No aux load. (2)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Minerva Road, Farnworth, Bolton, BL4 0JR (3 components)
• CHP generating for site load, which exceeds generating capacity. No aux load. (2)
• CHP generating in NHS hospital. No aux load.
Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU F18102 Rejected BL4
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...