Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

35 unique locations (1652 components) - Page 1 of 2

Active MW: 3374.69 MW
Inactive MW: 6803.92 MW
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Uttons Drove STW, Uttons Drove STW, Off Andersons Road, Swavesey Road, CAMBRIDGE, CB24 4UQ, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Tilbury STW, TILBURY-STW, Fort Road, TILBURY Essex, RM18 8UL, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Tilbury Flour Mill, Tilbury Docks, Tilbury RM18 7JU (4 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
THE STRINDS, OLD RADNOR, PRESTEIGNE, POWYS, LD8 2RN (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Sutterton WR, SUTTERTON RESERVOIR WB, Spalding Road, Sutterton, BOSTON Lincolnshire, PE20 2EX, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
STATION ROAD, NEWCASTLE UPON TYNE, NE12 6RH (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Stanbridgeford STW, STANBRIDGEFORD STW, A505 Bypass, Stranfordbridge, LEIGHTON BUZZARD Bedfordshire, LU7 9JG, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Semer WTW, Semer WTW, Hadleigh Road, Inbetween Semer/Nedging, IPSWICH, IP7 7HF, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Saltersford WTW, SALTERSFORD WTW - S1, Waterworks Office, Waterworks Lane, GRANTHAM Lincolnshire, NG31 7UL, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
ROOM SOUTH QUARRY, BROOM CROSS ROAD, STANFORD, SG18 9LB (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
RAISBY QUARRIES LTD, KNOWSTHORPE LANE, CROSS GREEN, LEEDS, WEST YORKSHIRE, LS9 0PH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Nayland-Pops Bridge WS, NAYLAND-POPS BRIDGE BS Off A134, Pops Bridge, Gt Horkesley, COLCHESTER, CO6 4JN, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
N/A (777 components)
• This unit will be a collection of domestic EV chargers, that will be selected for best fit when we get to the testing stage.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
• bus depot site
Inactive •
Grafham WTW, GRAFHAM WTW, Perry, HUNTINGDON Cambridgeshire, PE28 0BW, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
GRAFHAM DAM PS , PERRY, PE28 0BW (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Empingham Raw Water Booster, EMPINGHAM RAW WATER BOOSTER, Off Stamford Road, Empingham, STAMFORD Lincolnshire, LE15 8PG, (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Component has yet to be procurred (249 components)

Component has yet to be procurred

Inactive •
83.54 MW
Component has yet to be procured - Unproven DSR (76 components)

Component has yet to be procured - Unproven DSR

Active • 2025-26 (T-1), 2028-29 (T-4)
600.00 MW
Component has yet to be procured. (220 components)

Component has yet to be procured.

Inactive •
39.61 MW
Loading map...
Showing 25 locations