Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

383 unique locations (3919 components) - Page 2 of 16

Active MW: 3374.69 MW
Inactive MW: 6803.92 MW
Waltham X The Pavillion - Central and West Essex EN8 7BZ (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
Walderton, Walderton Pumping Station, Walderton, PO18 9EE (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Walderton Pumping Station, Walderton, Walderton, P018 (4 components)

"Portsmouth Water Walderton Pumping Station, Walderton, Walderton, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes …

Active • 2017-18 (TR)
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (23 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
University of Warwick, Coventry, CV4 7AL (81 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Unit 6, Factory Road, Standard Industrial Estate, Silvertown, E16 2EJ (2 components)

The CMU component reduces demand

Active • 2025-26 (T-4)
Unit 3, 4 Manor Farm Estate, Flint, CH6 5UY, (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Unit 1- Rushden, Higham Ferrers Bypass, Rushden, Northamptonshire, NN10 8RP (12 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.01 MW
Ulverston Market St - Lakes LA12 7LR (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
UCP Ltd - Norwich, Salhouse Road, Norwich, NR7 9AT (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
UCP Ltd - Norwich, Salhouse Road, Norwich, NR7 9AT (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1)
9.01 MW
Uckfield High St - West Surrey and Sussex TN22 1AG (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
Transport Avenue, Brentford, TW8 9HA (4 components)

"EMR European Metal Recycling Transport Avenue, Brentford, TW8 9HA The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
Tonbridge High St - North and West Kent TN9 1SG (1 component)

Commercial sites

Active • 2024-25 (T-1)
14.00 MW
TINWELL INTAKE, STAMFORD, PE9 3UD (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-1)
8.08 MW
Tilbury Flour Mill, Tilbury Docks, Tilbury RM18 7JU (4 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1)
Thomlinson Road, Longhill Ind Estate, Hartlepool, England, TS25 1N (4 components)

"EMR European Metal Recycling Thomlinson Road, Longhill Ind Estate, Hartlepool, England, TS25 1N The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
THIRD PARTY PRIVATE NETWORK, ADM MILLING ENO FORTH PORTS AUTHORITY, TOWER PLACE, EDINBURGH, EH6 7BZ (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.31 MW
THE STRINDS, OLD RADNOR, PRESTEIGNE, POWYS, LD8 2RN (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2021-22 (T-1)
The Docks, Sharpness, Berkeley, GL13 9UX (3 components)

"EMR European Metal Recycling The Docks, Sharpness, Berkeley, GL13 9UX The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
Tenax Road, Trafford Park, Trafford Park, Manchester, M17 1JT (4 components)

"S Norton and Co Ltd Tenax Road, Trafford Park, Trafford Park, Manchester, M17 1JT The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
Tedeco - Water Street, Kenfig Industrial Estate, Water Street, Port Talbort, West Glamorgan, SA13 2PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
14.00 MW
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
14.00 MW
Loading map...
Showing 25 locations