{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Ecotricity Generation Limited

7 unique locations (16 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Unit 3, Wallbridge Industrial Estate, Wallbridge, Stroud, Gloucestershire, GL5 3JU (2 components)
• This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the 11kV network in WPD's West Midland region.
• This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the 11kV network in WPD's West Midland region.
Storage Ecotricity Generation Limited Wallbridge Battery Storage GL5
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Severn Way, Berkeley GL13 9TN (2 components)
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
• This CMU is formed of a battery bank and PCS capable of providing 30MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's West Midland region.
Storage Ecotricity Generation Limited Berkeley Green Battery Storage Not Prequalified GL13
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Q Park, Bath Road, Inchbrook, Stroud, GL5 5HT (2 components)
• This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the 11kV network in WPD's West Midland region.
• This CMU is formed of two battery banks and PCS that when combined are capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the 11kV network in WPD's West Midland region.
Storage Ecotricity Generation Limited Q-Park Battery Storage Not Prequalified GL5
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region. (2)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Storage Storage (Duration 1h) Ecotricity Generation Limited Alveston Battery Storage Alveston Battery Storage Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Norrington Ln, Broughton Gifford, Melksham SN12 8LP (2 components)
• This CMU is formed of a battery bank and PCS capable of providing 15MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's South West England region.
• This CMU is formed of a battery bank and PCS capable of providing 15MW of power. The system is connected via switch gear and a transformer to the distribution network in WPD's South West England region.
Storage Ecotricity Generation Limited Norrington Battery Storage Not Prequalified SN12
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land to the west of West Ham Waterworks, Churchill Way W, Basingstoke RG21 6YR (2 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the distribution network in SSE's Southern England region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the distribution network in SSE's Southern England region.
Storage Ecotricity Generation Limited Thornycroft Battery Storage Not Prequalified RG21
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Garstons Track, Winchester SO21 2BJ, UK (2 components)
• This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the distribution network in SSE's Southern England region.
• This CMU is formed of a battery bank and PCS capable of providing in excess of 2MW of power. The system is connected via switch gear and a transformer to the distribution network in SSE's Southern England region.
Storage Ecotricity Generation Limited Sparsholt Battery Storage Not Prequalified SO21
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 7 locations