East Anglia Grid Storage One Limited

3 unique locations (16 components)

Active MW: 527.12 MW
Inactive MW: 492.71 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (4 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Active • 2025-26 (T-4), 2022-23 (T-1)
Land at Weirs Drove, Cambridge, CB25 0BP (9 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 3 locations