Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EQUINOR BLANDFORD ROAD LIMITED

6 unique locations (81 components)

Active MW: 33.00 MW
Inactive MW: 47.12 MW
Battery Storage, Keel Drive, Slough, SL1 2YA (1 component)

A 29.5MW New Build Battery Storage site

Inactive • 2023-24 (T-4)
Blandford Road, Poole, BH16 6AB (5 components)
• A 25 MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Boiler House, Central Manchester University Hospital, Oxford Road, Manchester M13 9WL, UK (4 components)
• A 20MW New Build Battery Storage site
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The Prospective Generating Unit will be an Edina TCG 2032B V16 4.5MWe CHP Gas Engine (or similar) situated on Central Manchester University Hospital site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (11 components)
• 4 x reciprocating engines
• A 20MW New Build Battery Storage site
• CHP Unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (56 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)
• 20 MW power plant comprising 10 x 2MW gas reciprocating engines. The power plant will be connected to the local electricity distribution network and local gas network.
• 50MW Lithium-ion Energy Storage System
• A 29.5MW New Build Battery Storage site
Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
Loading map...
Showing 6 locations