ENSO GREEN HOLDINGS LIMITED

9 unique locations (14 components)

Active MW: 156.08 MW
Inactive MW: 0.00 MW
Land north of Butterfly Lane, land surrounding Hilfield Farm and land west of Hilfield Lane, Aldenham, near WD25 8DD (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU ELSTREE H Rejected WD25
Active • 2027-28 (T-4)
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU (1 component)

A 46.000 MW / 69.00 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU FLEET Not Prequalified GU51
Active • 2027-28 (T-4)
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH (2 components)

A 100.000 MW / 150.000 MWh battery energy storage system (2)

Storage (Duration 1.5h) ENSO GREEN HOLDINGS R LIMITED ENSO GREEN HOLDINGS LIMITED New Build Generating CMU WALPOLE GUR Walpole 2 - Gunthorpe Road PE14
Active • 2028-29 (T-4), 2027-28 (T-4)
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH (1 component)

A 47.500 MW / 71.250 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 SL Not Prequalified SS11
Active • 2027-28 (T-4)
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
• A 110.000 MW / 165.000 MWh battery energy storage system
• A 120.000 MW / 180.000 MWh battery energy storage system
Storage (Duration 1.5h) ENSO GREEN HOLDINGS A LIMITED ENSO GREEN HOLDINGS LIMITED New Build Generating CMU WEST BURTON BB West Burton Bumblebee DN22
Active • 2028-29 (T-4), 2027-28 (T-4)
Land to the south of Church Farm, Somersham, IP8 4PN and land to the east of The Channel, Burstall, IP8 4JL (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BRAMFORD 2 IP8
Active • 2027-28 (T-4)
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4)
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED ENSO GREEN HOLDINGS P LIMITED New Build Generating CMU BERKSWELL HR BERKSWELL HR CV35
Active • 2028-29 (T-4), 2027-28 (T-4)
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system (2)

Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED BRAMLEY SOLAR LIMITED New Build Generating CMU Bramley FR Bramley Frith RG7
Active • 2028-29 (T-4), 2027-28 (T-4)
Loading map...
Showing 9 locations