ENERSYST LIMITED

1 unique locations (5 components)

Active MW: 9.44 MW
Inactive MW: 0.00 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
β€’ 3 x 2MW OCGT gas reciprocating engines
β€’ 4 x 2MW OCGT gas reciprocating engines
β€’ 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Storage Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) ENERSYST LIMITED New Build Generating CMU Rockingham Battery Rockingham Ext +3 more Not Prequalified BS11
Active β€’ 2027-28 (T-4), 2021-22 (T-4) ...