Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENERSYST LIMITED

139 unique locations (1241 components) - Page 10 of 14

Active MW: 12.86 MW
Inactive MW: 49.81 MW
Hewer Drive, Castle Gresley, Swadlincote , Derbyshire, DE11 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
3.43 MW
HEWER DRIVE CASTLE GRESLEY SWADLINCOTE DERBYSHIRE DE11 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
HIGHGROVE MEADOWS PRIORSLEE CASTLE FARM WAY TELFORD SHROPSHIRE TF2 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
Hirwaun House, Hirwaun Industrial Estate, Hirwaun CF44 9UL (1 component)

5 x 2.0 MW OCGT gas reciprocating engines

ENERSYST LIMITED Not Prequalified CF44
Inactive • 2020-21 (T-4)
Holywell Road Castle Bytham Grantham NG33 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
Kiln Yard Cuck Stool Lane Castle Acre King's Lynn PE32 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.43 MW
Land off Mount Road, Castle Gresley, Swadlincote, DE11 9ES (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAURELS HIGH ROAD BURGH CASTLE GREAT YARMOUTH NORFOLK NR31 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
3.43 MW
LINKS LANE ROWLAND'S CASTLE HAMPSHIRE PO9 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
3.43 MW
LITTLE CASTLE FARM, MONMOUTH ROAD, USK, NP15 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.43 MW
Loading map...
Showing 10 locations