Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

381 unique locations (2011 components) - Page 37 of 39

Active MW: 3644.08 MW
Inactive MW: 6534.53 MW
Ashton Keynes WTW, North End, Ashton Keynes, Swindon, United Kingdom, SN6 6NZ (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
3.68 MW
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4)
21.54 MW
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (7 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (7 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Ambley Road, Gillingham, ME8 0SJ (3 components)

"Planet Ice - UK Ambley Road, Gillingham, ME8 0SJ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
Almondsbury Pump Station, Highwood Lane, Almondsbury, Bristol, BS12 5DJ (3 components)

"Bristol Water Plc Almondsbury Pump Station, Highwood Lane, Almondsbury, Bristol, BS12 5DJ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby …

Inactive • 2017-18 (TR)
Alexandra Building, Alexandra Dock 1, Bootle, L20 1BX (3 components)

"EMR European Metal Recycling Alexandra Building, Alexandra Dock 1, Bootle, L20 1BX The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
Aldingbourne Pumping Station, Sheepwash Lane, Chichester, P020 6XX (3 components)

"Portsmouth Water Aldingbourne Pumping Station, Sheepwash Lane, Chichester, P020 6XX The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for …

Inactive • 2017-18 (TR)
Loading map...
Showing 10 locations