Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

378 unique locations (5711 components) - Page 3 of 16

Active MW: 2892.88 MW
Inactive MW: 7285.73 MW
BPI. Recycled Products - Dumfries, College Road, Dumfries, DG2 0BU (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Recycled Products - Dumfries, College Road, Dumfries, DG2 0BU (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
BPI. Recycled Products - Heanor, Heanor Gate Road, Heanor Gate Industrial Estate, Heanor, DE75 7RG (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Recycled Products - Heanor, Heanor Gate Road, Heanor Gate Industrial Estate, Heanor, DE75 7RG (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
BPI. Stretchfilms - Bridgwater, Bath Road, Bridgwater, TA6 4BF (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Stretchfilms - Leominster, Worcester Road, Leominster, Herefordshire, HR6 0QA (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Stretchfilms - Leominster, Worcester Road, Leominster, Herefordshire, HR6 0QA (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (25 components)
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brentfield Road Willesden London NW10 8JP (18 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
• Warrington Existing Site CHP
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Brixton WTW, Waterworks Road, Brixton Hill, London, United Kingdom, SW2 1SB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Buckden, St. Neots PE19 5XH (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4)
8.95 MW
BUCKLESHAM RIVER INTAKE WA, MILL ROAD BUCKLESHAM, IP10 0BY (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4)
8.95 MW
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (29 components)
• 1 x OCGT
• Commercial printers
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
BW007, Oldford High Lift, Oldford Highlift Pumping Station, Oldford Hi Resevoir, Iron Mill Lane, BA11 2ND (18 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BW016, Chew Magna, Winford Road, Chew Magna, Bs18, BS40 8QQ (16 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BW020, Dryhill, Queens Avenue, Portishead, Bs20, BS20 6NG (16 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW004, Egford Main, Egford Hill, Frome, BA11 3JJ (15 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW006, Oldford Borehole, Oldford Borehole, Lullington Lane, Frome, BA11 2NF (18 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW010, Axbridge, Cheddar Road, Cheddar, Axbridge, BS26 2DL (17 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW011, Barrow, Barrow Gurney Pump, Barrow Gurney, Bristol, BS48 3SH (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW012, Banwell Spring, Banwell Spring Pumping Station, Banwell, Weston Super Mare, BS29 6EA (24 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
BWW013, Blagdon, Station Road, Blagdon, Bristol, BS40 7UN (19 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW014, Cheddar T.W, Lower New Road, Cheddar, Bs27, BS27 3DY (18 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2.61 MW
BWW017, Chew Stoke, Chew Stoke Pump Station, Chew Stoke, Bristol, BS40 8XS (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
BWW026, Pucklechurch, Shortwood Road, Pucklechurch, Bristol, BS16 9PQ (19 components)
• Battery Energy Storage System
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.61 MW
Loading map...
Showing 25 locations