Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

631 unique locations (5208 components) - Page 3 of 64

Active MW: 3644.08 MW
Inactive MW: 6534.53 MW
Alexandra Building, Alexandra Dock 1, Bootle, L20 1BX (3 components)

"EMR European Metal Recycling Alexandra Building, Alexandra Dock 1, Bootle, L20 1BX The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
Almondsbury Pump Station, Highwood Lane, Almondsbury, Bristol, BS12 5DJ (3 components)

"Bristol Water Plc Almondsbury Pump Station, Highwood Lane, Almondsbury, Bristol, BS12 5DJ The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby …

Inactive • 2017-18 (TR)
Ambley Road, Gillingham, ME8 0SJ (3 components)

"Planet Ice - UK Ambley Road, Gillingham, ME8 0SJ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (7 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Ardagh Glass, Headlands Lane, Knottingley WF11 0HP (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Ardagh Glass, Portland Place, Irvine KA12 8JA (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO1 2TT (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (7 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 10 locations