Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

90 unique locations (685 components) - Page 1 of 4

Active MW: 2892.88 MW
Inactive MW: 7285.73 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (23 components)

CHP Unit (3)

Active • 2025-26 (T-4), 2025-26 (T-1) ...
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.31 MW
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.31 MW
ADM Seaforth, Seaforth Dock, Liverpool, Merseyside, L21 4PG (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.31 MW
Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO1 2TT (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
ASWARBY WW, LONDON ROAD A15 ASWARBY, NG34 9SE (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
Blackburn - Haslingdon Road, Haslingden Road, Blackburn, Lancashire, BB1 2PX (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BOCKING - WW, CHURCH LANE, CM7 5SQ (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
BPI. Films - Bromborough, 40 Thursby Road, Croft Business Park, Bromborough, CH62 3PZ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Industrial - Ardeer, Lundholm Road, Ardeer, Stevenston, Ayrshire, KA20 3LJ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1)
9.48 MW
BPI. Recycled Products - Dumfries, College Road, Dumfries, DG2 0BU (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Recycled Products - Heanor, Heanor Gate Road, Heanor Gate Industrial Estate, Heanor, DE75 7RG (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Stretchfilms - Bridgwater, Bath Road, Bridgwater, TA6 4BF (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
BPI. Stretchfilms - Leominster, Worcester Road, Leominster, Herefordshire, HR6 0QA (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
Buckden, St. Neots PE19 5XH (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4)
8.95 MW
BUCKLESHAM RIVER INTAKE WA, MILL ROAD BUCKLESHAM, IP10 0BY (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4)
8.95 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations