Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

33 unique locations (243 components) - Page 1 of 2

Active MW: 2892.88 MW
Inactive MW: 7285.73 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (10 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• Load reduction
• Load reduction.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (8 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
bournville place, Bournville Ln, Birmingham B30 2LU, UK (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Braunton Road Ashford Barnstaple Devon EX31 4BR (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
E Building, Western Road, North Harbour, Portsmouth, PO6 3EZ (11 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Friar's Pride Oxney Rd, Peterborough, PE1 5YW, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hawarden Industrial Park Clwyd Close Manor Lane Hawarden Deeside CH5 3PZ (12 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines.
• The CMU Component is made up of reciprocating diesel engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (6 components)
• 10 x 2MW gas reciprocating engines
• 10x 2MW Gas Reciprocating Engines
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (3 components)

A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (10 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (12 components)
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations