Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

84 unique locations (1282 components) - Page 5 of 9

Active MW: 3644.08 MW
Inactive MW: 6534.53 MW
Four Ashes ERF, Enterprise Drive, Wolverhampton, WV10 7DF (3 components)

Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Inactive • 2021-22 (T-1)
Energy Center, Ashton Street, Liverpool, L69 3GB (70 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Eggington IPS, Derby Road, Stretton, Derbyshire, DE65 6HA (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DE (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
East Kilbridem Leesburn Place, East Kilbride, Glasgowm GL74 4LR (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Dunbar Works, Dunbar, East Lothian, EH42 1SL (13 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
5.31 MW
Deeside, Engineer Park, Sandycraft, CH5 2QD (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.48 MW
CROXDEN QUARRY, FREEHAY, CHEADLE, STOKE ON TRENT, STAFFORDSHIRE, ST10 1RH (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-1)
CORNELLY QUARRY, HEOL Y SPLOT, SOUTH CORNELLY, BRIDGEND, MID GLAMORGAN, CF33 4RD (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-1)
CLODDACH QUARRY, ELGIN, MORAYSHIRE, IV30 8TW (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-1), 2020-21 (T-4)
Loading map...
Showing 10 locations