Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

704 unique locations (7037 components) - Page 14 of 29

Active MW: 1593.75 MW
Inactive MW: 8584.86 MW
Fraser Oakwood Lane Leeds West Yorkshire LS8 (14 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Fring WTW, FRINWW, Fring Road, Great Bircham, KING'S LYNN Norfolk, PE31 6SH, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Funtington, Chinchester, Chinchester, P018 (5 components)

"Portsmouth Water Funtington, Chinchester, Chinchester, P018 The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is …

Active • 2017-18 (TR)
Funtington, Chinchester, PO18 9LG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Gatehampton (Goring) Borehole, Gatehampton Road, Goring-on-Thames, Reading, United Kingdom, RG8 9LU (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Gibbet Hill Road, Coventry, West Midlands, CV4 7AL (69 components)

One of six CHP units at University of Warwick, Gibbet Hill Road, Coventry, West Midlands, CV4 7AL

Active • 2021-22 (T-4), 2020-21 (T-4) ...
Gillingham Hempstead Val - North and West Kent ME7 3PB (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
Gillman Road, Farlington Water, Treatment Works Farlington, PO6 1BT (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Godalming High St - Hampshire and South Downs GU7 1DW (1 component)

Commercial sites

Active • 2024-25 (T-1)
8.95 MW
Gold Cross, Pensford, Bristol, BS39 4DL (5 components)

"Bristol Water Plc Gold Cross, Pensford, Bristol, BS39 4DL The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Active • 2017-18 (TR)
Gorse Street, Blackburn, BB1 3EU (4 components)

"EMR European Metal Recycling Gorse Street, Blackburn, BB1 3EU The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Active • 2017-18 (TR)
Gosport High Street - Portsmouth and Worthing PO12 1DU (1 component)

Commercial sites

Active • 2024-25 (T-1)
14.00 MW
GRAFHAM DAM PS , PERRY, PE19 5XH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1)
8.08 MW
GRAFHAM DAM PS , PERRY, PE28 0BW (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2022-23 (T-1), 2021-22 (T-4)
GRAFHAM DAM PS, PERRY, PE28 0BW (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2023-24 (T-1), 2022-23 (T-1) ...
8.08 MW
GRAFHAM INTAKE (OFFORD) WA, OFFORD, PE19 5RG (22 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.08 MW
Grafham INTAKE WA, GRAFHAM INTAKE (OFFORD) WA S2, Offord, HUNTINGDON Cambridgeshire, PE19 5RG, (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Grafham WTW, GRAFHAM WTW, Perry, HUNTINGDON Cambridgeshire, PE28 0BW, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
GRAFHAM-WTW ,PERRY, PE28 0BW (10 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
8.08 MW
GRAFHAM-WTW, PERRY, PE28 0BW (32 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
8.95 MW
Gravesend St George Sc - North and West Kent DA11 0TA (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
Grays High St - South Essex RM17 6LU (1 component)

Commercial sites

Active • 2024-25 (T-1)
9.48 MW
Great Horkesley WW, GT HORKESLEY-TOGGS LA WTW, Tog Lane, Gt Horkesley, COLCHESTER, CO6 4BX (8 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2020-21 (T-1), 2020-21 (T-4) ...
Loading map...
Showing 25 locations