Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

EDF ENERGY NUCLEAR GENERATION LIMITED

100 unique locations (806 components) - Page 1 of 4

Active MW: 12486.02 MW
Inactive MW: 37312.94 MW
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (4 components)
• Heysham 1 Power Station CMU 2: [HY1219] T_HEYM12
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2020-21 (T-1)
ADDISON ROAD TUNBRIDGE WELLS TN2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
9.31 MW
ADMIRAL WALK TUNBRIDGE WELLS KENT TN2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
9.31 MW
ALICE CLOSE HEREFORD HR1 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
16.92 MW
Allensmore HEREFORD HR2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
20.17 MW
Asda Chelmsford, Chelmer Village Centre, Chemsford, CM2 6RE (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Coventry, Brade Drive, Walsgrave, CV2 2PN (11 components)
• Cottam Development Centre (CDC) CCGT single unit station
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Hull Kingswood, Kingswood Retail Park, Hull, HU7 4HS (4 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
Asda Kingswood, Kingswood Retail Park, Hull, HU7 4HG (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Asda Tunbridge Wells, Longfield Road , Tunbridge Wells, TN2 3EY (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
BAYHALL ROAD TN2 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2023-24 (T-1)
9.31 MW
Bayhall Road Tunbridge Wells Kent TN2 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2023-24 (T-1)
9.31 MW
BEAUFORT AVENUE HEREFORD HEREFORDSHIRE HR2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
20.17 MW
Belmont Road, Hereford, HR2 7JE (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
BLACKHURST COTTAGE CORNFORD LANE TUNBRIDGE WELLS KENT TN2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
9.31 MW
BLUEBELL WALK, TUNBRIDGE WELLS, TN2 (6 components)

EV charging on residential premises

Inactive • 2023-24 (T-1), 2022-23 (T-1)
9.31 MW
Bramling Crescent TUNBRIDGE WELLS Kent TN2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
9.31 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (5 components)
• 1.9 MW Gas gen ENER-G 1999
• A Battery Energy Storage System.
• Hunterston B Power Station CMU 7: [HU7-19] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BURDON DRIVE BARTESTREE HEREFORD HEREFORDSHIRE HR1 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
16.92 MW
CALEY ROAD TUNBRIDGE WELLS KENT TN2 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2023-24 (T-1)
9.31 MW
Camden Park Tunbridge Wells Kent TN2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
9.31 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
CHURCH LANE HAMPTON BISHOP HEREFORD HEREFORDSHIRE HR1 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
16.92 MW
Clay Hill Pit Hereford HR1 4EP (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Coppice Close TUNBRIDGE WELLS KENT TN2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
9.31 MW
Loading map...
Showing 25 locations