Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK Plc

17 unique locations (78 components) - Page 1 of 2

WILKIE COURT WOBURN SANDS MILTON KEYNES MK17 (8 components)

EV charging at residential premises

EV Charging E.ON UK Plc Not Prequalified MK1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.01 MW
WEATHERCOCK LANE WOBURN SANDS MILTON KEYNES BUCKINGHAMSHIRE MK17 (8 components)

EV charging at residential premises

EV Charging E.ON UK Plc Not Prequalified MK1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.01 MW
The Crescent, Grange-Over-Sands, Cumbria, LA11 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
1.63 MW
STONEBECK LINDALE GRANGE-OVER-SANDS CUMBRIA LA11 (4 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
0.81 MW
Scroby Sands Wind Farm, Admiralty Road, Great Yarmouth, NR30 3NS (3 components)

Offshore wind farm

Active • 2028-29 (T-4)
17.37 MW
NORTHUMBRIAN WATER LTD, TEESDOCK ROAD, BRAN SANDS, MIDDLESBROUGH, 66KV IMPORT, TS6 6UE (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
1.63 MW
NEW SUPPLY TO NEW A FAR MOSS ROAD BLUNDELL SANDS LIVERPOOL MERSEYSIDE L23 (4 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
0.81 MW
KENTS BANK ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (4 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
0.81 MW
Huntsman Drive, Seal Sands, TS2 1TT (4 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
COTTAGE CHARNEY ROAD GRANGE-OVER-SANDS CUMBRIA LA11 (4 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
0.81 MW
Loading map...
Showing 10 locations