E.ON UK PLC

222 unique locations (1058 components) - Page 1 of 9

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
Yeomans Way, Bournemouth, BH8 0BQ (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (8 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Waddon Marsh Purley Way Croydon CR0 4NX (1 component)

A reciprocating gas engine CHP providing hot water to a local heat network

Inactive • 2018-19 (T-1)
Visitors Car Park, Alexandra Park, Alexandra Drive, St Helens, WA10 3TP (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A, The Loddon Centre, Basingstoke RG24 8FL (3 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the SSE distribution network and local gas network.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL (2 components)

Battery Energy Storage System

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (7 components)
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered at the distribution boundary using a COP2 meter. There is no auxilliary load on site.
• This CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. It uses a COP2 meter at the distribution boundary and has no auxilliary load or additional generation on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Torr Achilty Power Station, Urray, Muir of Ord, Ross-shire, IV6 7QF (2 components)

Hydro Generation Gensets 1 & 2

Active • 2028-29 (T-4), 2027-28 (T-4)
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
To be confirmed once components are known (12 components)

To be confirmed once components are known

Inactive • 2021-22 (T-4)
25.04 MW
The Power House Commercial Road Wolverhampton WV1 3QS (8 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
The Owlcotes Centre, Varley Street, Pudsey, LS28 6AR (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
The Mall, Patchway, Bristol, BS34 5QT (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (12 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing

Active • 2026-27 (T-4), 2025-26 (T-4)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (12 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Speedwell Road, Parkhouse Industrial Estate, ST5 7RF, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations