Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

70 unique locations (869 components) - Page 1 of 3

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (6 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
A65, Kirby Lonsdale, Carnforth, LA6 2HH (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3)
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (21 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
• Gas fired CHP
• New build wind farm at Aberarder consisting of 12 wind turbines.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (8 components)
• Component has yet to be procured.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• To be confirmed once CMU components are known
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (10 components)
• Battery storage
• Gas fired generating units
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (7 components)
• Energy from Waste plant fuelled by biomass
• N/A
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Battery Lane, Marsh Lane, Boston, PE21 7SJ (1 component)

To be confirmed once CMU components are known

Inactive • 2022-23 (T-3)
BAYSTON HILL QUARRY, BAYSTON HILL, SHREWSBURY, SHROPSHIRE, SY3 0AW (6 components)
• A reciprocating gas engine CHP providing hot water to a local heating network
• Gas fuelled generation plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (9 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (12 components)
• The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (26 components)
• 1 x hydro turbine & synchronous generator
• 4MW battery co-located with a solar farm
• Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Centro 3, Maxted Close, Hemel Hempstead, Herts, HP2 7SU (6 components)
• DSR Component providing load turn down at a data centre
• Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
2.16 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (15 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Currock Road, Carlisle, Cumbria CA2 5AD (5 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Dairy Lane Westhamnett Chichester PO20 2BG (1 component)

4MW battery co-located with a solar farm

Inactive • 2022-23 (T-3)
Devons Road, Bromley by Bow, London, E3 3BF (14 components)
• A gas fuelled generating station.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Inactive • 2022-23 (T-3), 2018-19 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• CMU consisting of multiple gas reciprocating engines and alternators
• Energy facility comprising of reciprocating engine sets.
• TBC
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)
• A gas engine CHP site providing electricity & heat to the associated development
• On-site CHP - existing generating unit Pond Street London OS Grid Reference: TQ 272 854 NW3 2QG
• On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980
Active • 2025-26 (T-4), 2024-25 (T-4) ...
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (3 components)
• 3No 1.2MW gas CHP providing power, heat and CO2 in a horticultural environment
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ferndale Park, Century Road, Hull HU12 8FB (2 components)
• New build power station comprising of 20MW reciprocating generators, transformers and associated control room,switch room within a secure fenced compound.
• To be confirmed once CMU components are known
Inactive • 2022-23 (T-3), 2021-22 (T-4)
Forza Foods - 2000, 62 Devilliers Way, Normanton, Pontefract WF6 1GX, United Kingdom (9 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gascoigne Wood Mine Lennerton Lane Sherburn in Elmet Selby LS25 6LH (1 component)

To be confirmed once CMU components are known

Inactive • 2022-23 (T-3)
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (9 components)
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
• To be confirmed once CMU components are known
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (11 components)
• 1x diesel generator with a total rated gross power capacity of 2.900 MW
• A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
• Unit 3 at Saltend Power Station
Active • 2024-25 (T-1), 2022-23 (T-3) ...
Loading map...
Showing 25 locations