Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

14 unique locations (188 components)

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (7 components)
• Energy from Waste plant fuelled by biomass
• N/A
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)
• A gas engine CHP site providing hot water to a local district heating network
• BM Unit T_FFES-1 at Ffestiniog Power Station (Pumped Storage).
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Queens Road, Immingham, DN40 1QR (7 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Gas reciprocating engines
• To be confirmed once CMU components are known
Active • 2028-29 (T-4), 2022-23 (T-4) ...
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery storage
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• A gas fuelled generating station.
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Northfleet Mill, Crete Hall Road, Gravesend, DA11 9AD (18 components)
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Paper Mill carrying out DSR using load turn-down.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.00 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (14 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2025-26 (T-1) ...
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (11 components)
• A gas engine CHP site providing hot water to a local district heating network
• Bus depot site
• Load reduction
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tongland, Kirkcudbrightshire, DG6 4LT, Scotland (10 components)
• Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme
• Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (22 components)
• DSR component providing load turn down at a retail store
• Paper products manufacturing site carrying out DSR by load turn-down
• Unit 3 at Saltend Power Station.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.59 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
William Lee - Site 1, Callywhite Lane, Dronfield, S182XU (13 components)
• DSR Component providing load turn down at a data centre
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• on site generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (21 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• CMU consisting of multiple gas reciprocating engines and alternators
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 14 locations