Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

108 unique locations (1004 components) - Page 10 of 11

Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (1 component)

DSR component offering flexibility delivered by load turn down at a data centre

Inactive • 2021-22 (T-4)
25.90 MW
Broomhouse Lane, Edlington, Doncaster, DN12 1ES (3 components)
• DSR Component providing load turn down at a manufacturing site
• DSR Component providing load turn down at a piping systems manufacturing site
Inactive • 2021-22 (T-4), 2020-21 (T-1)
5.18 MW
Billingham Site, Haverton Hill Road, Billingham, TS23 1PY (4 components)

Chemical plant carrying out DSR using load turn-down.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Billerudkorsnäs Beetham Ltd Waterhouse Mills Beetham, Milnthorpe Cumbria LA7 7AR (2 components)

Load Shedding - This DSR component is a paper manufacturing site, which can reduce its power demand by control of its manufacturing process

Inactive • 2018-19 (T-1)
3.88 MW
Bath CHP, Midland Road, Bath, BA2 3EW (11 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.62 MW
Barrow Mill, Park Road, Barrow in Furness, Cumbria, LA14 4TR (16 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.00 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Baronet Works, Baronet Road, Warrington, WA4 6HA (1 component)

Chemical plant carrying out DSR using load turn-down.

Inactive • 2017-18 (TR)
Baddesley O&M Ltd, Merevale Lane, Atherstone, Warwickshire, CV9 2LA (4 components)

Energy from Waste plant fuelled by biomass

Active • 2028-29 (T-4), 2024-25 (T-4) ...
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (16 components)

A gas CHP supplying a manufacturing facility

Active • 2027-28 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 10 locations