Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK CHP LIMITED

3 unique locations (14 components)

Active MW: 874.28 MW
Inactive MW: 2749.95 MW
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (4 components)
• 9.999 MW Battery Storage unit located at Dunblane.
• A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. The battery system will be completely independent in terms of operation, metering, ownership etc to the Biomass Station.
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
E.ON UK Citigen, 47-53 Charterhouse Street, London, EC1M 6PB (2 components)

A site with a 5MW,2.5MWh (2C) Lithium Ion Battery system. The system is connected to the distribution network via the same connection as the sites two reciprocating gas engine CHPs. …

Inactive • 2020-21 (T-4)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (8 components)
• A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The battery system is completely independent in terms of operation, metering, ownership etc to the Biomass Station. The battery system is providing frequency response services (specifically Enhanced Frequency Response (EFR)) to National Grid Electricity Transmission plc.
• Generating Unit 3
Active • 2025-26 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 3 locations