Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Dockside Power Limited

94 unique locations (1099 components) - Page 1 of 4

Active MW: 146.59 MW
Inactive MW: 1801.92 MW
XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (12 components)
• Energy facility comprising of reciprocating engine sets.
• Gas fired reciprocating engines.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Willow Holme Road, Carlisle, CA2 5RN (1 component)

Gas fired reciprocating engines

Inactive • 2021-22 (T-4)
West Thorpe, Willoughby on the Wolds, LE12 6TD - Please see additional information note accompanying connection agreement. (1 component)

Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.

Inactive • 2021-22 (T-4)
West Thorpe, Willoughby on the Wolds, LE12 6TD (13 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (12 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Gas Fired Reciprocating engines
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Unit F Prestige House Cornford Road Blackpool FY4 4QQ (5 components)
• Gas Fired Reciprocating engines
• New build gas generator
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Tynegrain Ltd, Tyne Dock, South Shields NE34 9PL (4 components)
• 0.35MWe CHP plant
• gas fired reciprocating engines
Inactive • 2022-23 (T-1), 2020-21 (T-4)
Titanium Road, Waunarlwydd, Swansea, SA5 4SG (9 components)
• Gas fired reciprocating engines
• Gas fired reciprocating engines.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Tir John N Rd, St Thomas, SA1 8NZ (9 components)
• 10 MW of demand reduction
• Reciprocating engines
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Tir John North Rd, Swansea, SA1 8NS (1 component)

Gas fired reciprocating engines.

Inactive • 2023-24 (T-4)
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (48 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
SPROUGHTON-RIVER INTAKE WA, SPROUGHTON, IP1 5AQ (5 components)
• Gas fired reciprocating engines.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (23 components)
• Callington - Existing Site CHP unit
• Gas fired reciprocating engines.
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (7 components)
• A 8MW New Build gas fuelled generating station.
• Gas fired reciprocating engines.
• Generating Unit 2
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (4 components)
• 1 x hydro turbine & synchronous generator
• Gas fired reciprocating engines.
• The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from Anaerobic Digestion (AD) biogas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The four components of the CMU (referenced VIR097, VIR098, VIR099 and VIR100) are MWM 2020 V12 units (VIR 097 is a MWM 2020 V16), built in 2011 and rated at 1,200kW (VIR097 is rated at 1,560kW). Each engine generates at 415V, which is then stepped up to 6.6kV for export.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations