Dockside Power Limited

11 unique locations (121 components)

Active MW: 146.59 MW
Inactive MW: 1801.92 MW
5 Mile Drive, Northwick, GL56 9TR (14 components)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Brunel Way, Briton Ferry, SA11 2GA (14 components)
• Gas fired reciprocating engines.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Dewy Rd, Tregaron, SY25 6JP (9 components)

Reciprocating engines

Inactive • 2017-18 (T-1), 2016-17 (TR)
Duncombe Rd, Four Lane Ends, Girlington, BD8 8TB (10 components)
• 6 x reciprocating engines
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
High Flatworth, North Shields, NE29 7UZ (7 components)

Reciprocating engines

Inactive • 2017-18 (T-1), 2016-17 (TR)
Main Ave, Hirwaun, CF44 9UY (14 components)
• Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Reciprocating engines
Inactive • 2017-18 (T-1), 2016-17 (TR)
Pengarnddu Ind Est, Dowlais Top, Merthyr Tydfil, CF48 2TA (12 components)
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Reciprocating Engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Somerden Rd, Hull, HU9 5PE (9 components)

Reciprocating engines

Inactive • 2017-18 (T-1), 2016-17 (TR)
Tir John N Rd, St Thomas, SA1 8NZ (10 components)
• 10 MW of demand reduction
• Reciprocating engines
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Titanium Rd, Swansea, SA5 4SF (8 components)

Reciprocating engines

Inactive • 2017-18 (T-1), 2016-17 (TR)
West Thorpe, Willoughby on the Wolds, LE12 6TD (14 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Loading map...
Showing 11 locations